EMIR


Main > Tech > Control System
  General
  Project Team
  Scientific Goals
 Guided Tour
 
  Tech
  Optical Layout
  Mechanics
  Control
  Software
  Hardware
  Pipeline
  Detectors
  Detector Test System
 
  COSMOS Project
  Outline
  Project Team
  Scientific Goals
  COSMOS Portal at IAC
 
  Miscellanea
  FAQ's
  Glossary
  Site Map
  Web Mirrors
 
  Links
  Near-Infrared
  Other


EMIR Control System


The Control System shall:

Facilitate the most efficient operation possible of EMIR to maximize the scientific return.
Allow EMIR and the telescope to operate as a single unit.
Make the system require minimal user intervention in normal operation.

This working group is formed by people from IAC, UCM and LAOMP, whose tasks are allocated as follows:

Instituto de Astrofísica de Canarias (IAC):
Universidad Complutense de Madrid (UCM):
Laboratoire d'Astrophysique - Observatoire Midi-Pyrénées (LAOMP):
  • EMIR Simulator Software.
  • Detector Test System Controller.


Click here to see many pictures of the detectors.